Project yield into dose-effect fitting curve
Usage
project_yield(
yield,
type = "estimate",
general_fit_coeffs,
general_fit_var_cov_mat = NULL,
protracted_g_value = 1,
conf_int = 0.95
)Arguments
- yield
Yield to be projected.
- type
Type of yield calculation. Can be "estimate", "lower", or "upper".
- general_fit_coeffs
Generalised fit coefficients matrix.
- general_fit_var_cov_mat
Generalised variance-covariance matrix.
- protracted_g_value
Protracted \(G(x)\) value.
- conf_int
Curve confidence interval, 95% by default.
Examples
fit_coeffs <- data.frame(
estimate = c(0.001280319, 0.021038724, 0.063032534),
std.error = c(0.0004714055, 0.0051576170, 0.0040073856),
statistic = c(2.715961, 4.079156, 15.729091),
p.value = c(6.608367e-03, 4.519949e-05, 9.557291e-56),
row.names = c("coeff_C", "coeff_alpha", "coeff_beta")
)
project_yield(yield = 0.67,
type = "estimate",
general_fit_coeffs = fit_coeffs[, "estimate"],
general_fit_var_cov_mat = NULL,
protracted_g_value = 1,
conf_int = 0.95)
#> [1] 3.094549
